This meeting was held in person at City Hall.
Commissioner Adams was absent
Commissioner Lee was absent
APPROVED: Rezoning and site plan for a proposed Toll Brothers development at 3400 Dexter Road. The 4.31 acre parcel, being annexed from Scio Township, would be rezoned from TWP (Township) to R4B (Multiple-Family Dwelling District). The site plan is for seven three-story townhome buildings with 30 total units (one three-unit building, three four-unit buildings, and three five-unit buildings). Each unit will have two garage spaces and two driveway parking spaces. There are plans for 2.82 acres of open space, including some wetland areas. (Legistar)
- This item was postponed from the June 16, 2026 meeting so staff and the developer could resolve issues with the proposed sidewalk along Dexter Road. The approval includes a condition requiring a north-side sidewalk connection between the site and Ironwood Drive. https://a2council.com/ann-arbor-city-planning-commission-june-16-2026/
- The rezoning and site plan will go to City Council for final approval.
- The developers held a public engagement meeting about this project on October 27, 2025. https://a2council.com/3400-dexter-ave-resident-participation-meeting-october-27-2025/
APPROVED: A revised site plan for 841 Broadway (“Broadway Park West”) removes the top level of the parking garage under the residential buildings and replaces it with five additional residential units. The lost parking will be relocated off-site to the adjacent Amtrak station lot. (Legistar)
- Broadway Park West is being built on the former MichCon/DTE gasworks site along the Huron River. City Council rezoned the site from M1 (Limited Industrial) to PUD (Planned Unit Development) on July 1, 2019. https://a2council.com/ann-arbor-city-council-july-1-2019/
- City Council approved the original site plan on September 21, 2020: 96 residential units, 8,200 square feet of retail, 5,600 square feet of restaurant space, a 148-room hotel, and at least six acres of public open space. https://a2council.com/ann-arbor-city-council-september-21-2020/
- On January 23, 2023, City Council amended the development agreement to allow 15 affordable housing units instead of a $2,057,350 payment to the Affordable Housing Fund. https://a2council.com/ann-arbor-city-council-january-23-2023/
- On July 21, 2025, City Council amended the project’s brownfield plan, shifting $3.1 million in reimbursements from environmental to non-environmental activities. https://a2council.com/ann-arbor-city-council-july-21-2025/
- On August 19, 2025, the Planning Commission approved adding a four-story, 22-unit apartment building, 18 of whose units are affordable. https://a2council.com/ann-arbor-city-planning-commission-august-19-2025/
APPROVED: Zoning for 2958 Shady Lane, a 5,227 square foot lot with a single-family home that is being annexed into the City from Pittsfield Township. The lot will be zoned R1D (Single-Family Dwelling District) to match surrounding City zoning. The owner is seeking connection to City water and sewer. No development is proposed. (Legistar)
APPROVED: Site plan for three additions to the Gift of Life Michigan building at 3861 Research Park Drive, the state’s organ and tissue donation center. The original eastern building and the front center wing will be demolished and replaced with a new laboratory and medical wing and a connector wing enclosing a new internal courtyard. A small utility room will be added at the rear. The additions total about 22,650 square feet, bringing the building to 91,570 square feet. Forty-nine new parking spaces will be added at the rear of the 6.56 acre site, which is zoned ORL (Office/Research/Limited Industrial). (Legistar)
- City Council was scheduled to adopt new bicycle parking standards the next day. Because the application had been filed in February, while those standards were still pending, the site plan showed enough bike parking to meet both the old and new standards: 60 spaces, when the old standards require 27 and the new ones 44. The new standards require much more covered bike parking (37 spaces vs. 5), which the petitioner said would cost $175,000. Gift of Life said its staff rarely bike to the site.
- The Commission amended the approval to require that bicycle parking conform to the standards in effect on August 5, 2026. This allows the applicant to revise the site plan and reduce the covered bike parking, subject to approval by the Planning Manager.
- The amendment passed 6-1 and the amended site plan was approved 5-2, with Chair Wyche and Commissioner Bassiouni voting no. Chair Wyche noted that the Planning Commission had itself recommended the new bicycle standards, and said “I do not accept that no one bikes.”
- City Council adopted the new bicycle and vehicle parking standards on August 6, 2026. https://a2council.com/ann-arbor-city-council-august-6-2026/
Legistar and Video Links
Legistar: https://a2gov.legistar.com/MeetingDetail.aspx?ID=1367597&GUID=B5A9DB4D-0B10-420A-9784-A7593578013F
YouTube: https://youtu.be/ep36RHe4kW0
CTN Video: https://ctnvideo.a2gov.org/CablecastPublicSite/show/11721
Meeting Length: 3h 16m