Ann Arbor City Planning Commission: March 1, 2022

Mar 1, 2022 | Planning

This meeting was held in person at City Hall.

POSTPONED: Recommendation that City Council approve amendments to the UDC:

  • Religious assembly added as a permitted use in the M1 (Limited Industrial) zoning district.
  • Permitting any number of marijuana facilities on a single lot, allowing multiple of the same kinds of marijuana license types on a single lot.
  • Reducing minimums for lot size, lot width, and lot area per dwelling unit in R2A district
    • 8500 square feet reduced to 5000 square feet minimum lot size
    • 60 feet to 40 feet minimum lot width
    • 4,250 square feet to 2500 square feet minimum lot area per dwelling unit
  • Street tree requirements exclude curb cuts from street tree planting frontage calculations. Street tree planting fee replaces reference to street tree escrow
  • Flexibility in street tree requirements for modification of a proposed site plan

These UDC amendments items were discussed and approved at the March 15, 2022 meeting: https://a2council.com/ann-arbor-city-planning-commission-march-15-2022

Legistar and Video Links

Legistar: https://a2gov.legistar.com/MeetingDetail.aspx?ID=931696&GUID=C949A199-C809-4AAF-8946-1E7E0676BE1D

YouTube: https://youtu.be/dIA1gs2JD7s

CTN Video: https://ctnvideo.a2gov.org/CablecastPublicSite/show/6528

Meeting Length: 1h 34m